"The site offers space for up to 1 GW of electrolysis and is located next to where Tennet’s Amaliahaven (380 kV) high-voltage substation will be built. This is the destination of the 2 GW DC cable from the IJmuiden Ver Wind Farm Zone Beta and a new hydrogen pipeline. Moreover, the site is close to the Evides water pipeline. The Port Authority is also exploring the possibility of connecting the Maasvlakte hydrogen plants to regional heat networks." See the original story at: Offshore Energy.
Source: Offshore Energy