"With long lead times at major shipbuilders, other yards that lack a track record in containership construction are now being considered if they can offer early delivery (around 2027)." Read the original story at: The Loadstar.
eeSea Signals
- MSC Operated Fleet
- MSC Operated Fleet by Vessel Deployment - Tableau Permission Required
- MSC Operated Fleet by Size Category - Tableau Permission Required
Source: The Loadstar