"BNSF Railway says a quarter of the container backlog that has stymied operations at its Dallas-Fort Worth intermodal terminal has been worked down through better equipment turnaround, improved yard operations, and greater chassis availability. But rail volumes out of the Southern California ports still need metering as the terminal works through thousands of long-dwelling containers." See the original story at JOC.
Source: JOC