The following release was published by CMA CGM:
CMA CGM is happy to announce the extension of its GUYANAS services to the port of Saint Laurent du Maroni in French Guiana.
The GUYANAS 2 service, which serves Georgetown (Guyana) on a weekly basis, will offer a monthly call in Saint Laurent du Maroni (French Guiana) with m/v "CEDRIC K".
The first call in Saint Laurent du Maroni will take place on Thursday, March 23rd, 2023.
Ex North European ports, cargo will be loaded onto following vessel:
- m/v "DOUCE FRANCE" voy. 0RTEDS1MA, expected to leave Le Havre on March 3rd, 2023
- Connection with m/v "CEDRIC K" in Port of Spain (Trinidad & Tobago) on March 17th, 2023
Exports from Saint Laurent du Maroni will benefit from the worldwide coverage offered by CMA CGM Lines network via Port of Spain.
Please note the following constraints linked to Saint Laurent du Maroni port characteristics:
- Maximum authorized weight: 26 tons per container (tare included)
- Shallow draught (4.50 m maximum) limiting cargo volume
- Reefers accepted only if removal is operated under ship's tackle by the customer
Source: CMA CGM